10-minute read
•
November 24, 2026

💡 TL;DR:
Before you sign, check the contractor's L&I registration, bond and insurance. Then ask how lien releases, written change orders and payments work, and who runs the job each day. Vague answers are a warning sign.
The questions to ask a remodeling contractor that matter most are the uncomfortable ones: licensing, lien releases, change orders and who's actually on site. This checklist gives Washington homeowners each question, what a good answer includes and the red flag to watch for.
Knowing how to choose a remodeling contractor comes down to how clearly each one answers a few direct questions before you sign. Clear, written answers point to a contractor who plans ahead, while vague answers are a common contractor red flag.
Use the table whether you're planning a kitchen remodel or a bathroom remodel. Each row pairs a question with a good answer and a red flag, and the sections below cover each one.
A remodeling contractor working on your home in Washington must be registered with the Department of Labor & Industries (L&I), bonded and insured. For registrations and renewals since July 1, 2024, the required bond is $30,000 for a general contractor and $15,000 for a specialty contractor. The bond covers unpaid labor and materials, plus amounts owed for breach of contract, including improper work.
The required liability insurance is at least $50,000 for property damage, $100,000 for injury to one person and $200,000 for more than one. L&I also accepts a $250,000 combined single limit policy instead. On a large remodel, the bond can be small next to the contract price, which is why the other questions still matter.
Washington law calls it contractor registration, though you'll also see it called a license. The registration number should appear in the contractor's ads and on the written bid, as L&I's Hire Smart guide notes. Enter it in L&I's Verify a Contractor tool and check these points:
Good answer: the number comes up front and matches Verify. Red flag: hesitation, or a bid name that differs from the registration.
How Vital Needs Remodeling answers this: Vital Needs Remodeling holds Washington contractor license #VITALNR771NJ and is bonded and insured. The team is happy to hand over the paperwork at the first visit.

A well-run job has one named person in charge each day and a written list of every subcontractor. Ask who that person is, which trades the contractor's own crew handles and how you'll get updates.
L&I recommends a contract that lists the major suppliers and subcontractors, so you know every company involved.
Use that list to confirm two things for each subcontractor:
A contractor who uses other workers must also have an active, up-to-date workers' comp account.
Good answer: a named lead, regular check-ins and a written subcontractor list. Red flag: "We'll see who's available," or no one clearly in charge.
How Vital Needs Remodeling answers this: Clients work directly with the owner, Vitaliy Gorokhovskiy.
A lien release is a signed document from a supplier or subcontractor confirming they have been paid and will not claim a lien. Without one, an unpaid supplier or subcontractor may be able to place a lien on your home even after you've paid the contractor.
Washington requires contractors to warn you about this risk. For residential work of $1,000 or more, the contractor must give you a lien disclosure statement before work starts. The notice includes the warning "YOUR PROPERTY MAY BE LIENED" and says you could pay twice for the same work. You sign to confirm you received it.
L&I's guidance suggests these steps:
A lien can generally be filed within 90 days after the claimant stops providing labor or materials. A supplier who doesn't contract with you directly generally must send you a notice of its lien rights to keep those rights. That notice is your cue to ask for its release. These are plain-language summaries of Washington's bond and lien rules, so talk to an attorney about any specific dispute.
Good answer: "Yes, and you get copies before the final payment." Red flag: the contractor says releases aren't needed or won't name their suppliers.
A change should be written up, priced and signed by you before the work changes. That written record is a change order, an amendment that adds, removes or alters work along with its price and schedule effect. L&I advises putting every change in scope or materials in writing and avoiding verbal amendments.
Ask how that process works:
Good answer: a signed change order with the price and schedule impact. Red flag: "We'll settle up at the end," or changes agreed only in passing.
How Vital Needs Remodeling answers this: Any change to scope goes into writing first. Scope, milestones and material costs are set in the detailed project plan, step four of the Vital Needs remodeling process.

The next questions to ask a contractor before renovation work starts cover permits, payments and the paperwork itself.
In most cases, the contractor you hire must take out the permits, and the permit holder is responsible for code compliance. Building permits come from your city or county, while electrical permits usually come from L&I or your city. Ask the contractor to confirm that required inspections happen before walls and floors are covered.
Good answer: "We pull the permits and schedule the inspections." Red flag: a request that you pull the permit yourself, which this guide to who pulls the permit in Snohomish County explains.
How Vital Needs Remodeling answers this: Vital Needs Remodeling pulls the required permits and coordinates inspections for the projects it builds.
L&I advises a reasonable down payment, then payments for completed phases rather than calendar dates. Hold back part of the price until all work is finished and you're satisfied.
Good answer: a reasonable down payment and a written schedule tied to finished phases. Red flag: cash only, or most of the price before work starts.
Read the whole contract before you sign, and consider legal advice on a large project. L&I says a contract should cover at least these items:
For a bathroom project, our bathroom remodel checklist shows how to write a scope of work so every bid prices the same job.
Good answer: a contract that covers every item on this list. Red flag: a one-page price with no scope or dates.
How Vital Needs Remodeling answers this: You receive a detailed written proposal before construction begins.
The last three questions show how a contractor's earlier jobs went and what happens after yours is finished.
Recent projects like yours give you a realistic preview of the work. L&I suggests viewing a contractor's finished work, talking with another homeowner or visiting a job in progress when you can.
Good answer: photos of similar remodels and clients you can call. Red flag: no references, or only very old ones.
How Vital Needs Remodeling answers this: Finished kitchens and baths, many with budgets and timelines, are on the Vital Needs projects page.
A written schedule should give a start date, a completion date and the material lead times that could move them. L&I suggests comparing start and end dates across bids, not just price.
Good answer: dates in writing and a plan for telling you when something slips. Red flag: no dates, or "we'll fit you in."
How Vital Needs Remodeling answers this: If tile or cabinets slip, the team tells you first, with the adjusted date.
A warranty only helps if its terms are written into the contract. Ask what workmanship it covers, for how long, and how manufacturer warranties on fixtures and materials work alongside it.
Good answer: a written workmanship warranty with a clear term and a way to request repairs. Red flag: a verbal promise only.
How Vital Needs Remodeling answers this: Every project carries a 12-month workmanship warranty, and manufacturer warranties are explained before work starts.
The questions to ask a contractor before hiring should be easy for a well-organized remodeler to answer. Write them down, ask them at every interview and compare the answers in writing.
Vital Needs Remodeling remodels kitchens and bathrooms across Snohomish and King County. Some clients call after an earlier contractor left a job unfinished. For the planning side of a remodel, see kitchen remodel mistakes that cost homeowners later. Schedule a free consultation and bring this checklist with you.
Common red flags include a contractor who asks you to pull a permit they would normally pull, or wants to be paid in cash only. Some also ask for most of the price up front or offer only a verbal quote. A registration number missing from the bid, or one that doesn't check out on L&I's Verify tool, is another.
Yes. A contractor, subcontractor or supplier who isn't paid can file a lien against the property they worked on. The filing window is generally 90 days after the claimant stops providing labor or materials. Washington also requires a lien disclosure statement on residential jobs of $1,000 or more. Lien releases collected before the final payment are a key protection.
L&I doesn't set a percentage, but it advises paying only a reasonable down payment and then paying for completed phases of work. Avoid paying in full until all work is done and you're satisfied. A large share up front leaves you little leverage if the job stalls, so compare down payment terms across your bids.
Ask whether the project finished on budget and on schedule, how changes were handled and whether the crew kept the site clean. Then ask if they would hire the contractor again and whether anything surprised them. Clients whose project was similar in size and scope to yours are the ones worth calling.
In Washington, start by checking the contractor's registration, bond and insurance on L&I's Verify tool. Get written bids, a written contract and the required lien disclosure statement before work begins. Then confirm who pulls the permits, pay by completed phase and collect lien releases before the final payment. Keep copies of every document.
Compare at least three written bids for the same scope, as L&I's guide to hiring a contractor recommends. Check that each bid includes permit fees, taxes and the same materials, since missing items can make a low bid look cheaper. L&I's guidance also cautions that focusing only on price can lead to a poor result, so weigh scope and warranty too.

Planning a kitchen or bathroom update and wondering where permits fit in? The answer depends less on Snohomish County and more on which city your house sits in.
Read More
Three cities in one county, and three different ways to get your project approved. The names and timelines differ, but the same kinds of work trigger review in all of them.
Read More
Layout, ventilation, wiring and finish-order errors can look fine on handover day and surface once you cook, plug in and live in the room.
Read More