💡 TL;DR:

In Washington, owners can usually change a unit's interior when the structure, shared systems and common areas stay untouched. Get your declaration and rules, submit plans early and wait for written board approval.

Which Rules Apply to a Condo Renovation in Washington?

Three layers shape a condo or townhome remodel: your governing documents, state law and city codes for things like noise. For day-to-day remodel questions, the governing documents usually decide.

The declaration creates the community and says where each unit ends. Bylaws set how the board votes, and rules cover the rest, such as elevator hours. State law defines a rule as an association policy that is not written into the declaration or organizational documents (RCW 64.90.010).

Which state law applies depends on when your community was created:

  • Newer communities: the Washington Uniform Common Interest Ownership Act, RCW 64.90, covers those created on or after July 1, 2018, plus older ones that opted in.
  • 1990–2018 condos: most fall under the Condominium Act, RCW 64.34, and some of its sections also reach pre-1990 condos.
  • Older lot-based HOAs: many fall under the Homeowners' Associations Act, RCW 64.38.
  • From January 1, 2028: RCW 64.90.360 extends the newer act to common interest communities generally, including older ones.

City permits are separate; see our guide to remodel permits in King County. This article is general information, not legal advice. If you disagree with a board decision, talk with your association or a Washington attorney.

Townhome Communities

In a townhome, you may own your roof, siding and windows, yet the declaration can still require approval to change them. Townhome communities can be set up as condominiums or as lot-based HOAs, so check which one yours is. Interior kitchen and bath work usually draws fewer questions. Before planning exterior work, check three things in the declaration:

  • Who owns what: whether the roof, siding and windows belong to you or the association.
  • Shared walls: whether work on a wall you share with a neighbor needs board review.
  • Exterior standards: approved colors, materials and window styles.

Condo Renovation Rules at a Glance

Most associations organize remodel rules around the same few areas. The table shows what owners commonly find and who usually answers, but your building's version is the one that counts.

Rule areaWhat associations commonly requireWhat to have readyWho to ask
Board approvalWritten approval before non-cosmetic workScope, drawings and product listProperty manager or board
Structure and wallsReview of structural, shared or exterior wall changesPlans showing which walls changeBoard, often with an engineer
Plumbing stacks and wet wallsShared lines stay put; tie-ins need approvalFixture and drain locationsBuilding engineer or manager
Flooring and soundSound-rated underlayment under hard floorsUnderlayment spec sheetManager
Work hours and noiseQuiet hours narrower than city codeSchedule for loud workManager (check the rules)
Elevators and common areasReserved elevator time and hallway protectionDelivery dates and debris routeManager or front desk
Contractor requirementsLicense, insurance certificate and sign-inLicense number and certificateManager
Townhome exteriorsApproval for windows, decks, roofs and colorsProduct specs and photosDesign committee

How Do You Get HOA Approval for a Condo Renovation?

You get HOA approval by submitting a written alteration request with plans, then waiting for a written decision before work begins.

In communities under the newer act, RCW 64.90.255 lets an owner alter a unit, subject to the governing documents. The work must not impair the structure or mechanical or electrical systems, or lessen support. Changing the appearance of the common elements needs board approval. The older Condominium Act has a similar rule, RCW 64.34.240, which also covers a unit's exterior appearance.

Documents can add steps, but a typical sequence looks like this:

  1. Get the documents. Ask the property manager for the declaration, rules and alteration form.
  2. Define the scope. List every change, with drawings for structural or plumbing work.
  3. Submit the request. Include product specs, the contractor's license and insurance certificate, and a schedule.
  4. Get approval in writing. Keep the signed approval and its conditions on file.
  5. Book the building. Reserve elevators and loading areas once dates are firm.

If your association adopts design standards under its declaration, RCW 64.90.505 requires an approval procedure with a reasonable time to act on applications. Our detailed material checklist, shared with the team before construction, can also supply the product details boards request.

‍

Edmonds bathroom after a layout change, with a wood vanity, glass walk-in shower and toilet against white tile walls

‍

Plumbing Stacks and What You Can Move in a Condo Bathroom Remodel

In most condos, fixtures can be replaced in place, but moving a toilet, shower or sink depends on where shared lines run. Two terms come up often:

  • Plumbing stack: the vertical drain and vent pipe that serves the units above and below yours.
  • Wet wall: the wall that holds the supply, drain and vent lines for a bathroom or kitchen.

Your declaration says whether a pipe belongs to one of three groups:

  • Common element: often a stack, because it serves more than one home.
  • Limited common element: shared property set aside for one or more owners, but fewer than all, under state law.
  • Your unit: whatever the declaration places inside your unit's boundaries.

Before designing around a new drain location, ask the manager whether building plans show where the stacks run.

That split often shapes a condo bathroom remodel more than finish choices do. Swapping a vanity or toilet in place rarely touches shared lines. Moving a toilet or adding a shower drain can mean new floor penetrations and a tie-in to the stack, which boards review closely.

In our Edmonds bathroom reconfiguration, the toilet shifted back 2 feet, with each plumbing change planned to code before work began. That was a house; a condo adds board review on top. If a layout change is on your list, our bathroom remodel planning starts with the drains.

Walls, Flooring and Sound

Interior walls that carry no load and hold no shared lines are often allowed with approval, while structural, demising and exterior walls need closer review. Hard flooring is the other flashpoint, since footsteps carry. Sort each change into a group:

  • Non-structural interior walls: often allowed with board approval, once someone confirms what is inside.
  • Structural, demising (between units) or exterior walls: usually need board review and an engineer.
  • Hard flooring: many buildings require a sound-rated underlayment, so ask for the exact spec in writing.

Our open-concept kitchen in Bellevue shows why the check matters: we verified the wall was non-load-bearing before it came out. In a condo, that finding would go to the board with the plans. If you plan a new opening, ask early whether the board wants an engineer's letter with the request.

‍

Shower walls covered in waterproofing board during bathroom renovation

‍

Work Hours, Noise and Elevator Booking

City noise codes set the outer limits for construction sound, and building rules are often narrower. Elevator and hallway rules decide how materials move, and buildings commonly set rules for:

  • Quiet hours: a shorter daily window for demolition, tile cutting and other loud work.
  • Elevator reservations: a booked slot for deliveries and debris, with elevator pads hung.
  • Common-area protection: floor runners and wall guards from the loading area to your door.
  • Debris and parking: where dumpsters and work vans may sit.
  • Neighbor notice: a posted or emailed schedule before loud work starts.

Ask for these rules in writing before you set a start date.

One client review on our About page notes the work area was cleaned at the end of each day and the crew stayed quiet.

Construction Hours in Bellevue, Kirkland, North Seattle and Mercer Island

Each city sets its own construction noise hours, and building rules often narrow them. These limits reach many owners. Between 31% (Mercer Island) and 51% (Seattle) of homes sit in buildings with five or more units, per the Census Bureau's 2024 five-year American Community Survey, table B25024.

Bellevue

In Bellevue, condo projects follow the city's general construction window. City code exempts construction sounds from 7 a.m. to 8 p.m. on weekdays and 8 a.m. to 6 p.m. on Saturdays (BCC 9.18.020). Condo work gets no Sunday or legal-holiday hours. The city grants exemptions only for narrow cases such as emergencies, and the added remodeling hours apply only to existing single-family homes. Plan remodeling in Bellevue around those limits.

Kirkland

Kirkland sets construction hours in its zoning code. It limits permitted development work to 7 a.m. to 8 p.m. Monday through Friday and 9 a.m. to 6 p.m. on Saturday (KZC 115.25). It allows none on Sundays or listed holidays, and a building's quiet hours can be shorter still. Our home remodeling in Kirkland page covers more.

North Seattle

Seattle ties construction noise hours to the zone a building sits in.

SMC 25.08.425 lets construction equipment exceed normal sound limits only at set hours:

  • Lowrise, Midrise, Highrise, Residential-Commercial and Neighborhood Commercial zones: 7 a.m. to 7 p.m. on weekdays and 9 a.m. to 7 p.m. on weekends.
  • All other zones: 7 a.m. to 10 p.m. on weekdays and 9 a.m. to 10 p.m. on weekends.
  • Impact tools, in any zone: 8 a.m. to 5 p.m. on weekdays and 9 a.m. to 5 p.m. on weekends.

For kitchen and bath remodeling in North Seattle, your building's zone sets the noise window.

Mercer Island

Mercer Island applies one schedule island-wide. City code allows permitted work from 7 a.m. to 7 p.m. Monday through Friday and 9 a.m. to 6 p.m. on Saturday, with none on Sundays or holidays (MICC 8.24.020). A Town Center condo and an East Mercer Way waterfront home start from very different plans, as our page on kitchen and bath remodels on Mercer Island notes.

Planning a Condo or Townhome Remodel?

A condo remodel runs smoother when the board package and build plan come together early. At Vital Needs Remodeling, we are licensed, bonded and insured (WA contractor license #VITALNR771NJ), and every project includes a 12-month workmanship warranty. You get one point of contact from planning through cleanup.

Reaching out six to eight weeks ahead gives design and material lead times room, and board review adds its own time. Request a free estimate, and bring your building's rules.

‍

Frequently Asked Questions

Are you allowed to renovate a condo?

Usually, yes. RCW 64.90.255 and, for older condos, RCW 64.34.240 let owners alter their own unit when the work does not impair the structure or mechanical or electrical systems, or lessen support. Your declaration and rules can add conditions, such as written approval, a flooring spec or set work hours. Changing how common elements look, such as hallways or exterior walls, needs board approval first.

How long does HOA approval take?

It depends on your community. If your association adopts design standards under its declaration, RCW 64.90.505 requires an approval procedure with a reasonable time to act on applications. In practice, timing often follows the board's meeting schedule and how complete your package is. Ask the property manager for the review period and submission deadline before you book a start date.

Can I remodel a bathroom in a condo?

Yes, most condo owners can remodel a bathroom, with board approval where the documents require it. Replacing fixtures, tile and vanities in their current spots is the simpler path. Moving a toilet or shower drain depends on the plumbing stack and floor structure, so boards often ask for drawings first. Ask early whether your building has a flooring or waterproofing spec.

Can you do renovations in a townhouse?

Usually, yes, especially inside. Kitchens, bathrooms and flooring are often handled like any home remodel, plus any approval your HOA requires. Exterior changes are different. Many townhome associations control roofs, siding, windows, decks, paint colors and shared walls. Check the declaration and submit plans before you order products or book a crew.

What happens if you renovate a condo without HOA approval?

The association can enforce its governing documents. Under RCW 64.90.405, which covers newer-act communities, an association may impose reasonable fines after notice and a chance to be heard. The board must adopt the fine schedule and give it to owners first. Your declaration may set other remedies, so read its enforcement section. If a dispute starts, talk with your association or a Washington attorney.

What is a limited common element?

A limited common element is part of the shared property set aside for one or more owners, but fewer than all. Washington's common interest ownership act defines it in RCW 64.90.010. Common examples include balconies, patios, parking spaces and storage lockers. Your declaration lists which parts of your building count, so check it before you change anything outside your unit's walls.

Related Blogs

Home remodel permit application documents and architectural blueprints laid out with contractor tools for plan review.

Remodel Permit in King County: What Seattle, Kirkland, and Kenmore Each Require

Three cities in one county, and three different ways to get your project approved. The names and timelines differ, but the same kinds of work trigger review in all of them.

Read More
Modern brushed nickel rain shower head mounted on faux marble porcelain tile wall.

Best Shower Wall Materials: How Tile, Slab, and Panels Handle Water

A side-by-side look at how tile, slab, and acrylic or fiberglass panels handle water, grout upkeep, and wear in a damp Pacific Northwest bathroom.

Read More
Modern kitchen remodel with walnut cabinetry, quartz counters, and tile backsplash.